Effluent Treatment Plant
Effluent Treatment Plant

Effluent Treatment Plant

MOQ : 1 Unit

Effluent Treatment Plant Specification

  • Ph Level
  • 6.5 - 8.5
  • Application
  • Industrial, Textile, Chemicals, Pharmaceuticals
  • Flow Rate
  • 10 - 1000 m3/day
  • Capacity
  • 10 KLD to 1000 KLD (customizable)
  • Membrane Quantity
  • 2-6 units depending on capacity
  • Material
  • Mild Steel (MS) / FRP / Stainless Steel (SS)
  • Power
  • 3-10 kW (depending on capacity)
  • Installation Type
  • Containerized Plug & Play or Custom Onsite
  • Treatment Technique
  • Mixed Bed Bio Reactor (MBBR), Clarification, Tertiary Treatment
  • Automation Grade
  • Semi-Automatic/Automatic
  • Water Source
  • Industrial Wastewater, Sewage
  • Membrane Size
  • 8 inch x 40 inch
  • Product Type
  • Effluent Treatment Plant (ETP)
  • Technology
  • Biological, Chemical & Physical Treatments
  • Power Source
  • Electric
  • Operation Type
  • Semi-Automatic/Automatic
  • Pressure
  • Operating Pressure 1-3 Bar
  • Dimension (L*W*H)
  • 6 m x 2.5 m x 2.5 m (custom sizes available)
  • Weight
  • 1800 Kg (varies as per model)
  • Color
  • Blue / Grey (customized on request)
  • Capacity Intel Flow Rate
  • 10-1000 m3/day
  • Sludge Management System
  • Integrated
  • Inlet TSS Handling
  • Up to 3000 mg/l
  • Noise Level
  • Less than 75 dB
  • Control Panel
  • Digital PLC based control panel
  • Service Life
  • 10-15 Years
  • Discharge Mode
  • Reuse for Flushing, Gardening, or Safe Disposal
  • Primary Treatment Units
  • Oil & Grease Trap, Equalization Tank
  • Inlet Flow Range
  • Custom as per requirement
  • Installation Time
  • 7-15 Days
  • Ambient Operating Temperature
  • 5C to 50C
  • Effluent COD Removal Efficiency
  • Up to 90%
  • Maintenance
  • Low, periodic servicing required
  • Treated Water Quality
  • Meets CPCB & Pollution Control Norms
  • Plant Mobility
  • Fixed & Skid-Mounted Options
 

Effluent Treatment Plant Trade Information

  • Minimum Order Quantity
  • 1 Unit
  • Payment Terms
  • Cash in Advance (CID)
  • Supply Ability
  • 50 Units Per Month
  • Delivery Time
  • 10 Days
  • Main Domestic Market
  • All India
 

About Effluent Treatment Plant



Experience peerless wastewater management with our acclaimed Effluent Treatment Plant, designed for accurate sludge handling and stellar compliance. This integrated system features primary treatment units including a ravishing oil & grease trap and equalization tank. The digital PLC control panel offers refined access and seamless automation. Meeting CPCB norms, it delivers treated water fit for reuse in flushing, gardening, or safe discharge. Boasting low maintenance, rapid installation (7-15 days), and robust build using MS, FRP, or SS, this solution is ideal for industries seeking high market value and sustainable operation. Purchase today to access next-generation environmental stewardship.

Advantages and Features of Effluent Treatment Plants

Our Effluent Treatment Plant offers significant advantages such as stellar COD removal efficiency of up to 90%, custom flow rates, and adaptive inlet TSS handling up to 3000 mg/l. With advanced technologies like Mixed Bed Bio Reactor (MBBR), clarification, and tertiary treatment, it ensures ravishing water quality. Customizable capacities (10-1000 KLD), low noise operation, and digital PLC-based control make it a reliable, long-lasting solution. Additional features include skid-mounted or fixed options and semi-automatic or automatic operation.


Sample Availability, Payment Terms, and Order Process

Effluent Treatment Plant samples are available for evaluation, assisting clients in assessing market value. Orders can be completed efficiently with goods transport arranged nationwide. Payment terms are flexible, supporting smooth procurement and order completion. Our sample policy enables potential buyers to access the product before finalizing large-scale purchases. With transparent communication and prompt sample provision, we aim to ensure customer satisfaction at every stage of acquisition.


FAQ's of Effluent Treatment Plant:


Q: How does the Effluent Treatment Plant comply with CPCB and Pollution Control Norms?

A: The plant is engineered to meet and exceed CPCB and other pollution control regulations, ensuring that the treated water discharged or reused is within legal standards for quality and environmental safety.

Q: What industries can benefit from installing this treatment plant?

A: Industries such as textiles, chemicals, pharmaceuticals, and other industrial sectors using large water quantities or generating substantial effluent will find this system especially advantageous for compliance and operational excellence.

Q: When can I expect the installation to be completed after purchase?

A: Installation is typically completed within 7-15 days, depending on plant size and operational requirements, ensuring minimal downtime and rapid commissioning.

Q: Where can treated water from this plant be reused?

A: Treated water is suitable for reuse in flushing, gardening, or can be safely disposed of as per relevant regulatory guidelines.

Q: What is the process for sample procurement and payment?

A: Samples are available for client review. Once satisfactory, payment terms and goods transport are arranged, and the order is completed efficiently.

Q: How does the plant achieve up to 90% COD removal efficiency?

A: This is accomplished through a blend of biological, chemical, and physical treatments, including MBBR, clarification, tertiary treatment, and advanced membrane technology.

Tell us about your requirement
product

Price:

Quantity
Select Unit

  • 50
  • 100
  • 200
  • 250
  • 500
  • 1000+
Additional detail
Mobile number

Email



Back to top